Directional Drillingand utility civils in Deeside
Deeside runs along the Dee estuary in Flintshire, with Deeside Industrial Park and the A494 and A55 carrying traffic into North Wales. Light Speed Utilities Ltd carries out directional drilling, launch and reception pits, utility civils and reinstatement in Deeside for water, gas, electric and telecoms networks.
Nearby: Mold, Chester, Ellesmere Port
Our services in Deeside
Deeside combines large industrial sites with residential areas, so routes often cross busy distributor roads, site entrances and dense existing services. Most work in Deeside is industrial park duct and pipe crossings, verge runs along the A roads and residential service connections.

Directional Drilling
Steered bores under roads, verges, watercourses and live services, including the launch and reception pits.
- Road crossings
- Verge runs
- Launch and reception pits

Utility and Civils
Excavation, duct and cable installation, chambers and cabinet bases for utility networks.
- Ducting
- Cable laying
- Chambers and cabinets

Reinstatement
Trenches, pits and excavations backfilled and resurfaced in carriageways, footways and verges.
- Carriageway
- Footway
- Verges
Working in Deeside
What work do you carry out in Deeside?
In Deeside (CH5) we take on directional drilling, launch and reception pits, utility civils and reinstatement for water, gas, electric and telecoms. Deeside combines large industrial sites with residential areas, so routes often cross busy distributor roads, site entrances and dense existing services.
How far is Deeside from your base?
Deeside is about 12 miles from our base on the Wirral, well within our regular working area, so site visits are straightforward to arrange.
Is directional drilling a good fit in Deeside?
Yes, especially for crossings. On industrial sites and distributor roads around Deeside, drilling keeps site entrances, yards and traffic moving while the duct or pipe goes under them.
What kind of jobs come up in Deeside?
Typical work in and around Deeside includes industrial park duct and pipe crossings, verge runs along the A roads and residential service connections. Each job is priced from the route, the length and what is going in, and there is no charge for a quotation.
Can you work near Deeside Industrial Park?
Yes. Routes near Deeside Industrial Park are planned around the traffic, the access and the services already in the ground in that part of Deeside. Send us the route and any service plans and we will advise whether to drill or trench each section before we price it.
How quickly could you start in Deeside?
With Deeside about 12 miles from the Wirral, a site visit is normally arranged within one to two weeks. Start dates depend on the work already booked in, and we will give you a realistic date against your programme.
Nearest areas to Deeside
The closest towns we cover by distance from Deeside, and nationwide work from our base on the Wirral.
Planning a utility crossing in Deeside?
Send us the route and we will come back with a price and a programme.