Directional Drillingand utility civils in Deeside

Deeside runs along the Dee estuary in Flintshire, with Deeside Industrial Park and the A494 and A55 carrying traffic into North Wales. Light Speed Utilities Ltd carries out directional drilling, launch and reception pits, utility civils and reinstatement in Deeside for water, gas, electric and telecoms networks.

Nearby: Mold, Chester, Ellesmere Port

Directional drill rig on a highway verge with the rod going into the ground, Light Speed Utilities Ltd, serving Deeside CH5

Working in Deeside

What work do you carry out in Deeside?

In Deeside (CH5) we take on directional drilling, launch and reception pits, utility civils and reinstatement for water, gas, electric and telecoms. Deeside combines large industrial sites with residential areas, so routes often cross busy distributor roads, site entrances and dense existing services.

How far is Deeside from your base?

Deeside is about 12 miles from our base on the Wirral, well within our regular working area, so site visits are straightforward to arrange.

Is directional drilling a good fit in Deeside?

Yes, especially for crossings. On industrial sites and distributor roads around Deeside, drilling keeps site entrances, yards and traffic moving while the duct or pipe goes under them.

What kind of jobs come up in Deeside?

Typical work in and around Deeside includes industrial park duct and pipe crossings, verge runs along the A roads and residential service connections. Each job is priced from the route, the length and what is going in, and there is no charge for a quotation.

Can you work near Deeside Industrial Park?

Yes. Routes near Deeside Industrial Park are planned around the traffic, the access and the services already in the ground in that part of Deeside. Send us the route and any service plans and we will advise whether to drill or trench each section before we price it.

How quickly could you start in Deeside?

With Deeside about 12 miles from the Wirral, a site visit is normally arranged within one to two weeks. Start dates depend on the work already booked in, and we will give you a realistic date against your programme.

Nearest areas to Deeside

The closest towns we cover by distance from Deeside, and nationwide work from our base on the Wirral.

Planning a utility crossing in Deeside?

Send us the route and we will come back with a price and a programme.

Discuss your project

Send us where the bore or duct run needs to go, what is going in and when. We work from the Wirral and take on directional drilling and utility civils across the UK.

Phone  Email 
Based onThe Wirral, working nationwide