Launch and Reception Pitsshored excavations for directional drilling

Launch and reception pits for directional drilling, dug to depth, shored with frames and sheet piles and kept safe for the drill string to enter and exit. The pits are part of our directional drilling service, so the same company sets them out, digs them, runs the bore and reinstates them afterwards.

Looking down a shored pit with steel frames and sheet piles and the drill string coming through

What the work includes

Set out to the bore

Pit positions and depths are set from the planned bore profile, so the drill string enters and leaves at the right angle and the pilot bore starts on line.

Shored excavations

Where the depth or the ground needs it, pits are shored with steel frames and sheet piles, with ladder access, so they stay safe to work in for the length of the job.

Water and spoil

Groundwater and drilling fluid collect in the pits, so they are pumped and the spoil is managed as the bore progresses rather than left to build up.

Backfill and reinstatement

When the duct or pipe is through, the shoring comes out and the pits are backfilled, compacted and reinstated to the surface they were dug from.

Photos from site

Shored pit from above with frames, ladder and drill string
Shored pit from above with frames, ladder and drill string
Steel frames and sheet piles holding the sides of a pit
Steel frames and sheet piles holding the sides of a pit
Reamer on the drill string in a pit dug in a verge
Reamer on the drill string in a pit dug in a verge
Drill rig beside a crash barrier with an open pit in the verge
Drill rig beside a crash barrier with an open pit in the verge

Frequently asked questions

What are launch and reception pits?

The two excavations at either end of a directional bore. The rig drills from the launch pit, the pilot bore surfaces in the reception pit, and the duct or pipe is pulled back between them. Everything in between stays in the ground.

Why do some pits need shoring?

Deeper pits, loose ground and wet ground can collapse, which is a danger to anyone working in the pit and to the bore. Steel frames and sheet piles hold the sides back so the pit stays safe and the right shape for the work.

Can you dig pits for another drilling contractor?

Pits are normally dug as part of our own directional drilling jobs. If you need pits on their own, send the details and we will tell you whether we can take it on.

What happens to the pits after the bore?

The shoring is removed, the pits are backfilled and compacted in layers, and the surface is reinstated to match what was there, whether that is verge, footway or carriageway.

How deep does a pit need to be?

That depends on the bore profile, the ground and the services in the area. The depth is set from the planned line of the bore, and the shoring is chosen to suit.

Areas we cover

Launch and Reception Pits from our base on the Wirral, across Merseyside, Cheshire, Greater Manchester and North Wales, and nationwide.

Planning a pit excavation?

Send us the route and we will come back with a price and a programme.