Directional Drillingand utility civils in Crewe
Crewe is a railway town in south Cheshire, with the A500 linking it to the M6. Light Speed Utilities Ltd carries out directional drilling, launch and reception pits, utility civils and reinstatement in Crewe for water, gas, electric and telecoms networks.
Nearby: Northwich, Chester, Runcorn
Our services in Crewe
Crewe is a built up town where most utility runs pass under footways, driveways and side roads, and drilling keeps homes and businesses accessible while the duct or pipe goes in. Most work in Crewe is road crossings, business park duct runs and residential service connections.

Directional Drilling
Steered bores under roads, verges, watercourses and live services, including the launch and reception pits.
- Road crossings
- Verge runs
- Launch and reception pits

Utility and Civils
Excavation, duct and cable installation, chambers and cabinet bases for utility networks.
- Ducting
- Cable laying
- Chambers and cabinets

Reinstatement
Trenches, pits and excavations backfilled and resurfaced in carriageways, footways and verges.
- Carriageway
- Footway
- Verges
Working in Crewe
What work do you carry out in Crewe?
In Crewe (CW1) we take on directional drilling, launch and reception pits, utility civils and reinstatement for water, gas, electric and telecoms. Crewe is a built up town where most utility runs pass under footways, driveways and side roads, and drilling keeps homes and businesses accessible while the duct or pipe goes in.
How far is Crewe from your base?
Crewe is about 32 miles from our base on the Wirral, a routine distance for our teams, and travel is built into the price rather than charged separately.
Is directional drilling a good fit in Crewe?
Usually, for crossings. Under roads, drives and footways in Crewe a bore avoids breaking out and reinstating long lengths of surface, while short sections and connections are often quicker to trench.
What kind of jobs come up in Crewe?
Typical work in and around Crewe includes road crossings, business park duct runs and residential service connections. Each job is priced from the route, the length and what is going in, and there is no charge for a quotation.
Can you work near Crewe station?
Yes. Routes near Crewe station are planned around the traffic, the access and the services already in the ground in that part of Crewe. Send us the route and any service plans and we will advise whether to drill or trench each section before we price it.
How quickly could you start in Crewe?
With Crewe about 32 miles from the Wirral, a site visit is normally arranged within one to two weeks. Start dates depend on the work already booked in, and we will give you a realistic date against your programme.
Nearest areas to Crewe
The closest towns we cover by distance from Crewe, and nationwide work from our base on the Wirral.
Planning a utility crossing in Crewe?
Send us the route and we will come back with a price and a programme.