Directional Drillingand utility civils in Northwich
Northwich is a Cheshire market town on the River Weaver, surrounded by villages and rural lanes. Light Speed Utilities Ltd carries out directional drilling, launch and reception pits, utility civils and reinstatement in Northwich for water, gas, electric and telecoms networks.
Nearby: Warrington, Runcorn, Widnes
Our services in Northwich
Around Northwich much of the work is on rural roads and verges, where boring under hedgerows, field entrances and watercourses avoids disturbing the ground and keeps narrow lanes open. Most work in Northwich is rural verge runs, crossings under lanes and watercourses, and town service connections.

Directional Drilling
Steered bores under roads, verges, watercourses and live services, including the launch and reception pits.
- Road crossings
- Verge runs
- Launch and reception pits

Utility and Civils
Excavation, duct and cable installation, chambers and cabinet bases for utility networks.
- Ducting
- Cable laying
- Chambers and cabinets

Reinstatement
Trenches, pits and excavations backfilled and resurfaced in carriageways, footways and verges.
- Carriageway
- Footway
- Verges
Working in Northwich
What work do you carry out in Northwich?
In Northwich (CW9) we take on directional drilling, launch and reception pits, utility civils and reinstatement for water, gas, electric and telecoms. Around Northwich much of the work is on rural roads and verges, where boring under hedgerows, field entrances and watercourses avoids disturbing the ground and keeps narrow lanes open.
How far is Northwich from your base?
Northwich is about 24 miles from our base on the Wirral, a routine distance for our teams, and travel is built into the price rather than charged separately.
Is directional drilling a good fit in Northwich?
Very often. On rural routes around Northwich, boring under lanes, hedgerows, field entrances and watercourses avoids disturbing the ground, and verges are reinstated quickly where open sections are needed.
What kind of jobs come up in Northwich?
Typical work in and around Northwich includes rural verge runs, crossings under lanes and watercourses, and town service connections. Each job is priced from the route, the length and what is going in, and there is no charge for a quotation.
Can you work near the River Weaver?
Yes. Routes near the River Weaver are planned around the traffic, the access and the services already in the ground in that part of Northwich. Send us the route and any service plans and we will advise whether to drill or trench each section before we price it.
How quickly could you start in Northwich?
With Northwich about 24 miles from the Wirral, a site visit is normally arranged within one to two weeks. Start dates depend on the work already booked in, and we will give you a realistic date against your programme.
Nearest areas to Northwich
The closest towns we cover by distance from Northwich, and nationwide work from our base on the Wirral.
Planning a utility crossing in Northwich?
Send us the route and we will come back with a price and a programme.